Well Integrity Specialist / OPS
Company
Altea Energy
Employment type
Full-time
Posted
Aug 24, 2026
Listed via
Altea Energy
Job DescriptionWell Integrity Specialist / OPS
Report to Co-EP Manager
StatusRotation 4X4 / Based in OC
PLANNING & DRILLING PHASE
A. Pre-Spud Planning
- Review well design (surface, intermediate, and production casing programs) for compliance with company well integrity standards and local regulations (e.g.,
- NORSOK D-010, API RP 90, ARH Decree 94-43).
- Define barrier philosophy, setting depths, cement top requirements, and pressure test schedules for each casing section.
- Evaluate formation integrity test (FIT) and leak-off test (LOT) data from offset wells and new wells.
- Review and approve cementing programs, expected top of cement (TOC).
- Define wellhead & BOP configuration and barrier verification tests before spud.
B. Drilling Execution Support
- Monitor real-time well integrity parameters: annular pressures.
- Ensure primary cement barrier is achieved and verified via CBL/VDL logs, temperature logs, and pressure tests.
- Review and approve the remidial cement job, during drilling phase.
- Verify casing pressure tests, nipple-up/down BOPs, and ensure correct pressure rating hierarchy.
- Approve wellhead installation and test records, and confirm all mechanical barriers (float collars, plugs) are functioning properly.
- Investigate and document loss of integrity events, casing leaks, sustained casing pressure (SCP), annular communication.
COMPLETION & PRODUCTION PHASE
A. Handover & Initial Integrity Validation
- Conduct handover from drilling to production team, ensuring all barrier verifications and test certificates are available.
- Establish reference well integrity baseline (tubing, annulus pressures,temperature, corrosion monitoring, SCSSV test).
- Establish the well Dossier for approval from authority to put the well into production phase.
B. Routine Monitoring & Maintenance
- Monitor annulius and record trends for early anomaly detection.
- Establish the procedure for annuli pressure investigation and restoration tof their integrity.
- Review down hole safety valve (DHSV), surface safety valve (SSV), and wellhead seal tests.
- Implement corrosion and erosion monitoring (chemical injection efficiency, scale inhibitors, etc.).
- Validate pressure integrity after interventions, workovers, or stimulation operations.
- Classify well integrity status: Safe I Requires Attention I Unacceptable
C. Risk Management & Reporting
- Conduct Well Integrity Reviews and risk ranking as per ARH, NORSOK D-010 &ISO-16530.
- Maintain and update Well Integrity Database (SAP, WIMS, eWIMS, or company system).
- Recommend remedial actions for annular pressure or barrier failures (e.g., squeeze cement, mechanical plug, straddle packer).
INTERVENTION/ WORKOVER PHASE
A. Well Diagnostics
- Plan and interpret diagnostic logs: CBL/VDL, noise/temperature logs, pressure buildup tests, spinner surveys.
- Identify sources of leaks, communication paths, or barrier degradation.
B. Remedial Design & Execution
- Design repair operations such as:
- Squeeze cementing.Patch or liner installations.
- Bridge plug or mechanical barrier placement.
- Define barrier verification tests tagging, inflow/pressure tests, CBL confirmation.
C. Verification & Documentation
- Supervise testing of secondary barriers before returning the well to production.
- Update the Well Integrity file and close out action items in the integrity management system.
PLUG & ABANDONMENT (P&A) PHASE
A. Pre-P&A Evaluation
- Review full well history, including integrity issues, annular pressures, and barrier performance.
- Identify hydrocarbon-bearing zones, over-pressured formations, and environmentally sensitive aquifers.
- Define minimum safe abandonment depth (MSAD) and barrier strategy (rock-to rock cement plugs).
B. Barrier Design & Placement
- Develop permanent isolation program:
- Primary barrier: seals the reservoir.
- Secondry barrier: isolates intermediate formations or casing shoes.
- Surface barrier: seals openhole/casing annuli near surface.
- Plan and verify plug lengths, placement tools (balance plugs, dump bailer, section milling, perf & squeeze), and test methods.
- Apply verification methods per NORSOK D-010: Tag, Pressure test, CBL/VDL log, Cement returns.
C. Regulatory Compliance & Reporting
- Ensure compliance with ARH Decree 94-43, NORSOK D-010, and company standards.
- Prepare Final P&A Report with:
- Barrier schematics and test evidence.
- Plug depths, slurry volumes, and cement verification.
- Summary of retrieved tubulars, cut & pull depths, and environmental isolation confirmation.
D7ocumentation , Auditing & Continuous Improvement
- Establish the Well Integrity Management System (Manual+ Software).
- Maintain all well integrity records (test certificates, CBL reports, annulus pressure charts, intervention logs).
- Lead or participate in well integrity audits and regulatory inspections.
- Update internal standards, checklists, and barrier design guidelines based on field experience.
- Provide training and mentoring for operations engineers and supervisors on integrity assurance practices.
Explore more
Similar oil & gas jobs
- Control Room Operator — Altea Energy
- Construction Manager / Project Manager — Amazon — Altea Energy
- SURF Subsea Structures Design Engineer — Altea Energy
- SURF Material, Welding & NDT Specialist — Altea Energy
- Administrative Assistant — Altea Energy
- Road Safety Officer — Altea Energy
- Transport Officer — Altea Energy
- Senior Construction & Modularization Advisor — Altea Energy
Oil & Gas Alert tracks 30+ employer career pages and delivers daily digests of
new vacancies. Set your own keywords →