Hydrotest
To safely execute hydrostatic pressure testing activities, ensuring piping systems and pressure vessels meet design, quality, and integrity requirements prior to commissioning and operation.
Perform hydrostatic pressure testing of piping systems, vessels, and equipment in accordance with approved procedures and specifications.
Safely prepare, install, operate, and dismantle hydrotest equipment, including pumps, hoses, blinds, and pressure gauges.
Verify system integrity by identifying and reporting leaks, defects, or pressure losses during testing activities.
Ensure all hydrotest activities are conducted in compliance with safety requirements, permits, and company procedures.
Maintain accurate test records and documentation to support quality and commissioning requirements.
Support construction, pre-commissioning, and commissioning activities while promoting a strong safety culture and teamwork.
Similar oil & gas jobs in Indonesia
- Crane Operator — NOV, Batam
- Senior Lifting Engineer — NOV, Batam
- Tugas Akhir Internship - Tangguh Future - Indonesia — BP, Jakarta
- Kerja Praktek Internship - Tangguh Future - Indonesia — BP, Jakarta
- Director, Operations & Business Development (Indonesia) — KBR, Jakarta
- Graduate - Mechanical and Process Engineering - Indonesia — BP, Jakarta
- Fabrication Engineer Opporunities — Subsea7
- Summer Internship - Wells - Indonesia — BP, Jakarta